MTR-2 position in the offshore balikpapan waters, which is about 11 Nm. Current position is in south Latitude 1 degress 25,586 minutes South and Longitude 116 degrees 54,683 minutes East. Only 30 minutes of time required to reach from the port balikpapan. MTR-2 will move in accordance with the platform position is to be done. But the location of the platforms were not too far away, which distance from the port balikpapan not exceed 30Nm. Since the MTR-2 is not equipped with a drive machine, so every movement is always pulled by tug boat. During carrying out the well drilling operation used eight anchors used to tie it, so that its position becomes stable. The anchors are connected to the barge using a wire Roop, which is always inspected every time the suspense.
Oktober 20, 2009
Strength in depth of the blue sea
Roaring chase the time ................................
Through the darkness of night ......................
Tearing silent sea...........................................
At the top of this rig, we serve.......................
Like the human body, muscle strength is determined by the bone covering. We are strong, because we've got everything. Forces of nature can not be resisted, but we strive to continue to serve for the oil and gas, for the prosperity of this country.
Everyone will feel at home in my arms
Sea conditions are unpredictable, sometimes the sea can become malignant and make everyone who works in the sea becomes uncomfortable. Everyone who came in the MTR-2 is aimed at the same work and earn a living for families who wait at home. All people have the same expectation of returning home alive and bring money. So that the safety and comfort of working in the MTR-2 was observed, for the MTR-2 was performed with various facilities that can make everyone comfortable. MTR-2 facilities are quite adequate, among others: Galley, Recreation Corner, Game Corner, Lounge, Gym, clinics, etc.
Oktober 12, 2009
Crew Activities
Materialman always apply FIFO (First In First Out) & LILO (Last In Last Out) principle in warehouse management
Radio operators are monitoring the news and compile daily reports, every person onboard and that will leave the MTR-2 is obliged to report themselves.
One way to dispel the boredom of work in each shift work is always given time to all those who onboard to drink coffee and eat snacks, or which often referred to as coffee time
Beautiful sea view and the cool breeze which always adorned BBQ held once a week. It aims to establish intimacy among all people and to all those who are working feel happy.
Compilation data people who are prepared onboard and called the POB, as well as data compilation stop cards that have been made by all the people working here. That is the task of RIG Clerk.
Safety First is also applied in the kitchen, the quality of food and processed food should always be controlled by the Camp Boss.
There are three things that really determines the quality of health services, namely: professional medical personnel (doctors and paramedics), the readiness of medical equipment and adequate supplies of medicines.
Activities that can be implemented as a means of recreation is watching TV, playing games with the Play Station and fishing.
Langganan:
Postingan (Atom)